BLACK START PERFORMANCE TESTS

BLACK START PERFORMANCE TESTS

The Black Start Service Performance Testing, consist of two stages as Unit Testing, and Production Facility Recovery Test. TEIAS will be followed the same test steps below but literally to reflect actual network conditions (blank lines are energized, island mode stability), by isolating the system in a region of interconnected that this service will offer production facilities and is connected, a production plant recovery test, When it deems necessary, it can be performed as system test.

Recovery Unit Test, while existing connections with the transmission system of the relevant production facilities, domestic needs bus dropped off the unit to perform only emergency-power test will be performed by commissioning fed by the generator. Recovery Test Unit of the relevant production facilities will be performed on all units provide these services is essential.

Manufacturing Plant recovery tests, the relevant production facilities all outputs of the feeder, or the internal needs busbars by isolating the transmission system connection is completely disconnected from the testing unit to be, to the unit's emergency generator supplied through the commissioning will be performed . Manufacturing Plant Recovery Test, related production facilities in the absence of a connection to the transmission system is done by selecting a single unit.